Call
Takeuchi TL12V2 compact track loader clearing East Texas land

Metal Buildings & Barndominiums

BTX Siteworks delivers complete metal building solutions — site clearing, engineered pad, concrete foundation, and structural steel erection — all under a single point of contact.

What's Included

  • Pre-engineered metal building (PEMB) erection
  • Custom weld-up steel structures
  • Barndominium shell construction
  • Agricultural barns and equipment storage
  • Commercial warehouses and workshops
  • Turn-key service: clearing → pad → concrete → steel
  • Site clearing with compact track loaders before pad construction

Why BTX Siteworks

1
One contractor from raw dirt to finished building — our fleet handles clearing, pad prep, and material handling
2
Steel costs 30–50% less than traditional frame construction
3
Erected in a fraction of the time compared to wood framing
4
Resists termites, fire, warping, and extreme weather

Our Equipment In Action

Kubota SVL 75-2 with auger — post hole drilling for metal building prep

Our Kubota SVL 75-2 with heavy-duty auger drills precise column footing holes for metal building construction — clean, deep holes in East Texas soil without hand digging.

Frequently Asked Questions

What is a barndominium?
A barndominium is a metal building shell that is finished inside as a custom home — combining the durability, speed, and cost savings of steel construction with the open-concept floor plans and rustic farmhouse aesthetics that East Texans love.
How much does a metal building cost in East Texas?
Metal building costs vary by size, design, and finish level. Shell-only structures start around $12–$20 per square foot. Fully turn-key projects (site prep through erection) range significantly based on complexity. We provide detailed quotes after reviewing your plans.
What makes your turn-key service different?
Most customers must hire separate contractors for land clearing, dirt work, concrete, and steel erection — leading to scheduling conflicts and finger-pointing when issues arise. BTX handles every phase under a single contract and project manager.
Can you build a commercial warehouse?
Yes. We erect clear-span metal buildings for retail, automotive, light industrial, and distribution use — maximizing interior square footage without load-bearing pillars for flexible layouts.
How long does it take to erect a metal building?
The steel erection phase typically takes 1–3 weeks depending on the building size. Complete turn-key projects (clearing through erection) typically run 4–8 weeks total.

Ready to Get Started with Metal Buildings & Barndominiums?

Free on-site consultation and detailed estimate. Same-day response guaranteed.